East Park Community Development Orlando, FL
|
|

|
The site consists of 545 acres with planned development zoning allowing 1100 residential
units to be constructed in 7 phases. EED Serves as District Engineer and Engineer of record for the East Park Community Development
District. EED developed the construction plans and permitted 5 of the phases consisting of 423 single family units, 53 three
unit townhouses, community recreational areas, parks and bike trails. The construction plans included, all infrastructure
improvements including 6 miles of roads, 5.1 miles of portable water mains, 4.4 miles of reuse water mains, 5.5 miles of gravity
sanitary sewer, 1.4 miles of sanitary force, 3 lift stations and drainage. EED also obtained all construction permits including
City of Orlando,
South Florida Water Management District, Florida
Department of Environmental Protection and the US Army Corps of Engineers.
Return to Portfolio
|
Partin Groves Orlando, Florida
|
|

|
The Proposed development will consist of a 102-lot single-family residential subdivision,
along with internal streets, pedestrian sidewalks, and two (2) stormwater wet detention facilities. The proposed stormwater
facilities have been designed to treat and attenuate the rate of discharge generated by a 25yr/24hr storm event. The post-development
design shall also accommodate the proposed widening of Conway Road. EED’s role was to prepare a preliminary
subdivision plan and application, prepare final subdivision plans and submit to the City for review and approval, meet with
the City of Orlando design engineers (Conway Road) to determine ingress/egress requirements onto Conway Road, prepare application for Driveway Connection to Conway Road. The scope included preparation and processing a Capacity Encumbrance Application
through the City of Orlando (if required) to process the Driveway Connection Permit Application, prepare Environmental Resource
Permit (ERP) Application for submittal to St. Johns River Water Management District, prepare for and attend all meetings including
coordination with sub-consultants and provide construction administration services which include response to Contractor’s
Request for Information (RFI), attend pre-construction conference, review and approve contractor’s shop drawings, review
contractor as-builts, prepare record drawings and prepare final certifications for all permitting agencies.
Return to Portfolio
|
Rock Springs Ridge Subdivision Apopka, FL
|
|

|
The Rock Springs Ridge Subdivision consists of 1,342
acres with Planned Development (PD) Zoning allowing 1,320 Single Family Residential Units, 9 and 18 Hole Golf Courses.
EED’s role was to develop a master conceptual
drainage plan for the subdivision for review and approval by the Saint Johns River Water Management District (SJRWMD). As
each phase of this project was constructed our work included the preparation of plans and permitting through the SJRWMD and
the Florida Department of Environmental Protection.
Additional scope included construction plans, paving, drainage and utility plans,
layout residential lots to ensure compatibility with the golf courses, digitize all streets, lots, and golf courses, develop
a master utility plan (Water, Sewer and Reuse) which addresses lift station locations, forcemain sizing, fireflow requirements
and treated effluent reuse lines, and designed and permitted the stormwater collection system for each phase of the project.
Prepare a revised water use permit application, prepare and submit EN-50 semi-annual reports and coordinate with the Golf
Design Group. Perform Construction Administration Services including review
of as-built drawings, response to requests for information, attend Pre- and Post construction meetings, coordination with
City of Apopka.
Return to Portfolio
|
The Enclave
Orange County, FL
|
|
|
The development
of an 18.8 acre site, located on the west side of Hiawassee Road approximately ½ mile north of Silver Star Road, into a residential subdivision of 50 single-family
lots.
EED is
responsible for permitting the project requires preparation and processing of a preliminary subdivision plan, capacity encumbrance
application through Orange County,
environmental resource permit application through Saint Johns River Water Management District, final engineering plan approval
and Florida Department of Environmental Protection water and sewer permits. Final
engineering plans included the design and permitting of 2700 L.F. of roadway 3110 L.F. of gravity sanitary sewer, 660 L.F.
of sanitary force main and 1lift station. Construction administration services include review of as-built drawings, response
to requests for information, assist with bid/award documents, attend pre- and post construction meetings, perform site visits
and provide substantial completion and final inspections.
Return to Portfolio
|
Wetherbee Lakes Subdivision
Orange County, FL
|
| |
The first
phase includes 111 lots and a lift station and 12,385 LF (off-site) + 1440+ (on-site) LF of force main, and the Phase I Infrastructure.
EED's
role was to analyze the approved primary and secondary drainage system design and calculations; Analyze the approved water
distribution system and modify; Analyze the approved fire flow calculations and modify; Analyze the approved sanitary sewer
system and modify; Analyze the 100 year flood compensating storage calculations; Design an outfall system to connect Phase
I to Pond FA, and prepare submittals for OUC, Designed the potable water distribution system and sanitary sewer collection
system to serve this development. SFWMD and FDEP. Provide construction administration services that include but are not limited
to final construction documents, engineering reports, cost estimates, schedules and monitoring of all construction.